LINEDESK
All sections
ChangeoverLining 90024265p.39

Changeover overview

Thirty-step tooling and recipe change sequence.

Section 5 is a 30-step changeover. Start by removing energy per plant policy, rotating the press safety block to the safe position, and wearing PPE — punches and dies have sharp edges.

Work through safety and flag adjustment, liner infeed and cover height, sensors, air dump, covers and conveyors, fiber optics, vacuum lines, tooling-plate removal, die clean/install, punch swap (Lexan cover, 10 then 25 ft-lb cross-torque), tamp reset, guides, and the ten-point start checklist. Press and hold CYCLE START for three seconds to run.