LINEDESK
All sections
Belt changeVision 9002426-066-1p.51

Changing the belts — prep

LOTO, mark cameras and sensors, gather tools.

You can change or replace the belts and adjust conveyor tension.

Tools needed: • Imperial Allen key set • Open-ended wrench • Screwdriver

Before you begin: • Always turn off power and lock out the machine according to LOTO policy before changing the belts. • Mark and make note of the positions and locations of all sensors and cameras before beginning, so they can be reinstalled after the belt change.

Infeed and the third (second-inspection) conveyor are supplied with a white belt and a black belt — color-contrasted for better images depending on the caps in use.